Potain tower cranes support Trilogy Limassol Seafront project
To reduce erection costs and site disruption during the super elevation stages, the Potain engineers also advised using reinforced masts and anchorage frames. Cybarco took this advice on board and will require fewer building anchorages, as well as benefit from higher freestanding heights as a result, providing more working space as the buildings grow. Now in position on site, the erection and maintenance of the cranes is being carried out by skilled Uniplant technicians, as well as Potain?s expert engineers.
All three cranes are equipped with high-visibility cabins and operating cameras, making the job of the tower crane operator safe and efficient. The cranes are also equipped with the Potain Top Tracing System, which allows the cranes to communicate and avoid any possibility of collisions. Finally, each crane comes with a hydraulic erection cage, making the erection and super elevation stages faster and saving costs on mobile cranes for assistance. When complete, the Trilogy Limassol Seafront will provide 196 apartments and 52 offices.